Welcome to the GM Canada Dealer Network

GM EV
Infrastructure
Portal

English  | French

welcome

GM EV Assessment

InCharge Energy, an ABB majority owned company, has been selected by GM Canada to support General Motors dealers in supplying and installing electric vehicle charging equipment in preparation for your certification as an approved GM EV Dealer. Our history with GM includes supporting GM vehicle charging at GM’s proving grounds, GM Defense, as an approved supplier with GM Fleets and exclusive provider for GM Cruise.

First Steps in Getting Started

Depending on what stage your EV Infrastructure at your dealership is in, you will need a pre-site or post site assessment. The pre-assessment is to determine the electrical capacity, charging station locations, and to discuss and answer any questions about the EV infrastructure process. The post- site assessment will be for those dealers that have already installed the approved EV service equipment in their dealership, and to determine all equipment meets certification requirements, as well as a checklist and test to make sure all equipment is working properly. A pre-site assessment price of $1995.00, and a post site assessment price of $1750.00 has been negotiated by GM Canada. A virtual pre-site assessment, which is performed on-line for free is also available. The post-site assessment must be done in person by our technician. In both cases, InCharge Energy technicians will need access to the electrical by our technician. In addition, we require a review of the last twelve (12) months of electricity bills from your electric utility. Schedule your site assessment or post assessment here. Refer to our FAQ page for additional information.

Pre and Post Assessment Process

packages

GM Approved Options for Hardware

The InCharge recommended packages include a combination of Level 2 AC charging and DC Fast Charging depending upon your anticipated sales volume. This will enable your dealership to fast charge vehicles for quick turnaround in addition to offering a fast version of Level 2 AC charging.

Minimum Volume

1 L2 AC Charger – 19.2kW

1 DC Fast Charger
– 60 kW

2 YR In-Control Software

Final Installation – Activation

Medium Volume

2 L2 AC Charger – 19.2kW

2 DC Fast Chargers
– 30 kW + 60 kW

2 YR In-Control Software

Final Installation – Activation

High Volume

2 L2 AC Chargers – 19.2kW

4 DC Fast Chargers
– (2) 30 kW + 60 kW + 180 kW

2 YR In-Control Software

Final Installation – Activation

FAQ

Frequently Asked Questions

What EV charging equipment do I need for my dealership?

GM has approved several options of hardware for your dealership based upon anticipated volume of EV’s sold such as the Bolt EV and EUV. If you are still not sure, contact an EV charging expert at InCharge to determine the right equipment for your dealership.

How much does the equipment cost?

GM has negotiated a discounted rate on the EV charging equipment for your dealership. Prices for equipment will be included in the quotation following the site assessment. Your InCharge representative can also provide equipment cost estimates after a site assessment.

How long does it take to charge the electric cars I carry with this new equipment?

The battery specifications for the new Sierra EV have not been publicized yet. However, for the big battery pack version, you can expect that the ICE-30 might charge the battery from 20% to 100% in under 6 hours. Likewise, the ICE-180 should charge the same battery in under 1 hour.

How long does it take to receive my quotation after my site assessment?

The average time to receive your quotation is three to four weeks.

Why would I select a turnkey installation?

The InCharge team has experience installing EV charging equipment at thousands of dealerships across the U.S., Canada, Mexico, and beyond. By selecting InCharge for all your infrastructure needs, we ensure that the equipment will work whether there’s an issue with the equipment, software, or the electrical infrastructure. You can make one phone call to have your charging equipment serviced and get it back up and running, should it go down for any reason, so your dealership only communicates with one vendor, not multiple vendors.

What is a Final Bolt Down installation?

Many times a dealership prefers to work with their own electrical contractor. For cases like this, InCharge allows the dealer to follow prescribed requirements for the placement of the charging equipment and self-contracted electrical infrastructure that meets the National Electrical Code. InCharge will verify that the infrastructure was installed correctly through a review of the permit package and photographs, among other things. Once this review is completed, InCharge will ship the dealer the charging equipment and send technicians to your facility to do the ‘final bolt down’, the necessary electrical connections and equipment commissioning.

My dealership allows public access to the area where I’m installing charging equipment. Can I limit access to the EV charger?

Our software, In-Control, allows dealers to limit access by requiring a PIN or the use of an RFID card.

What is the standard warranty on the EV charging equipment?

The equipment warranty is two years. InCharge offers an extended warranty that can extend the manufacturer’s warranty up to five (5) years.

How do I read my proposal?

InCharge can support review of the proposal via in person or remote.

About InCharge

InCharge Energy, an EV infrastructure leader, brings innovative solutions to electrification. In-Charge was formed with the leadership and support of industry leaders who have over one hundred years of combined electric vehicle and charging experience, having deployed more than 20,000 charging stations. The world leader in eMobility, ABB, made a majority stake investment in InCharge in January of 2022. Our seasoned team has experience working with utilities, fleet management, OEMs, engineering and more. We provide scalable, turnkey, end-to-end commercial energy and infrastructure solutions, including planning, engineering, financing, installation, operations, and maintenance.

We offer a broad portfolio of charging stations including a variety of L2 and DCFCs, reliable manufacturing partners, preferred pricing, and certified EVSE installation kits. InCharge also offers its own proprietary end-to-end charger management platform designed expressly for fleet and charging application: InControl Software. InControl manages charging stations access control, usage data, remote management, and network operations. Our software provides load management to reduce fleet total cost of operations (TCO) and peak energy demand. InControl is built for fleets with security and reliability paramount as well as designed for scalability of fleets, facilities,
and vehicles.

Registration

Please reach out to learn more, or if you have any questions about electrifying your commercial fleet, researching grants and incentives, or just general questions about the EV Infrastructure process. InCharge is here to help.